LOT 2- Construction of 330kV Double Circuit New Haven - Aliade Transm…
Partnership with Chrome Consortium Energy and Akay Electric, for Construction of Transmission Line Only contract. Scope: 211 km. Epc Contract.

Raising of 330kV OHTL to achieve the Minimum Standard Vertical Clearance at Different Transmission Towers Line. Relocation of 33kV and telephone cables at Owerri interchange along the ROW
Julius Berge PLC
Second Niger Bridge
N/A
EPC Sole Contractor
Explore other engineering solutions from our portfolio.

Partnership with Chrome Consortium Energy and Akay Electric, for Construction of Transmission Line Only contract. Scope: 211 km. Epc Contract.

The Design, Manufacture, Supply, Test, Delivery to the Site, and Installation of all materials and equipment of the 132kV DC OHTL from the Existing Okpai 132kV S/S to the New Kwale 132kV S/S
Intervention Project: Engineering, Procurement, Construction, and Installation of the Collapsed Towers & Restringing of Kainji - Birnin Kebbi 330kV OHTL